top of page

Post

Community Clean-Up May 18th, 2024

Writer: Muskingum Township
Muskingum Township
Apr 21, 2024
1 min read

The Trustees will be sponsoring a sponsoring a community cleanup day on May 18th, 2024 from 8:00 am to 1:00 pm for Muskingum Township Residents. We are going to have two locations where you can bring your large items for disposal. The east side disposal will be located at the Muskingum Township Townhall, 26 Townhall Road, in Devola. The west side location will be at the Profusion overflow parking lot, BF Goodrich Road, across from the Oak Grove Christian School. We ask that you bring proof of residency asyou dispose of your items.

Below is a list of acceptable and non-acceptable items or you may click here for a printable version:

KIMBLE COMPANIES CANNOT ACCEPT THE FOLLOWING ITEMS:

  • Asbestos (friable)

  • Closed Drums

  • Gasoline Tanks

  • Propane Tanks

  • Liquid Waste

  • Waste Oil

  • Hazardous or Toxic Materials

  • Solvents

  • Paint Thinner or Paint

  • Fluorescent or Mercury bulbs

  • Appliances containing Freon (fridge, air conditions, freezer)

  • Sludge

  • Regulated Infectious Materials

  • Insecticides or Pesticides

  • Fertilizer

  • Batteries

  • Tires

  • Hot or Smoldering WasteACCEPTABLE MATERIALS:

  • Asphalt, Brick, Concrete

  • Ceramic

  • Conduit, Drywall, Insulation, Masonry

  • Metal, Wood, Plastic

  • Tile

  • Windows

  • Wiring

  • Brush, Compost, Grass Clippings

  • Clothing, Shoes

  • Computers, TV’s, Electronics

  • Furniture

  • Household Garbage

  • Food garbage

  • Mattress and Box springs

Recent Posts

See All
Fall Clean-Up Day October 10, 2026

The Trustees will be sponsoring a community cleanup day on October 10th, 2026 from 8:00 am to 1:00 pm, or until containers are filled which could occur earlier, for Muskingum Township Residents. We ar

 
 
2026 Fall Newsletter

Please click here to read the Fall newsletter which was also mailed to the residents.

 
 
Paving Update Week of August 3, 2026

Due to water break on Alden, paving will be postponed on it until work is completed. Weather permitting Woodrow, from Masonic to Lawton, will be paved August 4. Starting Thursday, August 6th working o

 
 
bottom of page